TRANSPORT REFURBISHMENT INFORMATION

   


Lin’s offers complete refurbishments on propane trailers.

Annual VK (visual leakage) Testing

5-Year Testing

----P Testing (pressure or hydro test)

----I Testing (internal) – consists of a wet magnetic particle test – done internally consisting of the complete surface internally of the front and rear heads and all internal pressure retaining and non-pressure retaining welds

----UC Test (upper coupler) – consists of physically pulling down the upper coupler and doing an intensive visual and structural examination

Repainting of the Vessel to Customer Specs

General Repairs

Code Repairs

Update Piping

 

Call today for details and scheduling.

1-800-252-5467(LINS)
 

 

 

   
Copyright 2007 - Lin's Propane Trucks- All Rights Reserved